Capacity | 8000BPH |
Model RFC-H series | 14-12-5 | 16-16-5 | 24-24-8 | 32-32-10 | 40-40-10 | 50-50-12 | ||
Washing-Filling-Capping | 14-12-5 | 16-16-5 | 24-24-8 | 32-32-10 | 40-40-10 | 50-50-12 | ||
Producing capacity(600ml) | 2000-4000(b | 5000-7000(b | 8000-12000(b | 12000-15000(b | 16000-20000(b | 20000-24000(b | ||
Applicable bottle (mm) | Ï=50-108 H=170-340 330ml-2.25L | |||||||
Pressure (kg/cm2) | 2~3 | |||||||
 Outside vacuum pump power (kw) | Main motor1.5kw | Main motor2.2kw | Main motor3kw | Main motor4kw | Main motor7.5kw | Main motor9.5kw | ||
Overall dimension (mm)Â (LxWxH) | 2100x1400x2500 | 2460x1720x2650 | 3100x2100x2650 | 3500x2500x2650 | 4600x1800x2650 | 5200x4500x3400 | ||
Weight(kg) | 2500 | 3500 | 4200 | 5500 | 6800 | 7600 |
No. | Production gory | Capacity |
1 | Hot filling production | 3,000-36,000B/td> |
2 | Beverage processing System | 1,000 Ltrs/H to 10,000 Ltrs/H |
3 | Bottled water production | 3,000-36,000B/td> |
4 | 5L Large capacity bottled water production | 700-5,000B/td> |
5 | Carbonated drink production | 3,000-18,000B/td> |
6 | Pulp juice production | 5,000-22,000B/td> |
7 | Oil Filling | 3,000-10,000B/td> |
8 | lling machine | 300-900B/td> |
9 | Bottlle Unscrambler | Up to 20,000B/td> |
10 | 3/5 Gallon Barrelled water production | 300-2000 bucket/H |
11 | Water Treatment system | 1,000 Ltrs/H to 10,000 Ltrs/H |
12 | OPP Labeling machine | 6,000-24,000B/td> |
13 | PVC Shrink Sleeve Labeling machine | 6,000-24,000b/td> |
14 | Automatic Blow molding machine | 1,000-7,000B/td> |
15 | Full-automatic Film Wrapper & Shrinker | 5-30packs per minutes |
Q1: Are you a trading company or a manufacturer?
 A:  We are a manufacturer, we supply the factory price with good quality, welcome to visit.
 Q2: What's your guarantee or the warranty of the quality if we buy your machines?
A:  We offer you the high quality machines with one year guarantee and supply long life technical  support.
 Q3: When can I get my machines after I paid?
A:  The delivery time is based on the exact machine you confirmed.
 Q4: How can I install my machines when they arrive?
A:  We will send our engineers to your factory to install the machines and train your staffs how to operateÂ
the machines.
Q5: How about the spare parts?
A:  After we deal with all the things, we will offer you a spare parts list for you refer.What we have
Shippingmw