Join today and be a part of the fastest growing B2B Network Join Now

Square counterflow cooling tower

  • Origin: China
  • Location: Science and technology industrial park, zaoqiang county, hengshui city, hebei province, China
  • Supply Type: oem service
  • Processing Time: 60day
  • Min Order: 1

Supplier Info.

  • Location Science and technology industrial park, zaoqiang county, hengshui city, hebei province, China
  • Employees Total 501-1000
  • Annual Revenue US$1 Million - US$2.5 Million

1. The special packing of the incpezoidal wave square tower is adopted, which has exnt thermal performance and small ventilation resistance, so that the cooling tower achieves a compact structure and a small floor space;

2, the use of airfoil type hollow structure large diameter, large area, low speed, low dynamic pressure fiberglass fan blades, the use of this type of cooling tower has significant features of energy saving, low noise;

3. Ultra-low noise cooling tower is equipped with high-efficiency noise reduction device in the air inlet and outlet and rain shower area, so that the same level cooling tower can effectively reduce noise by 5dB (A);

4, can be combined in various forms of parallel, more suitable for large-volume circulating cooling water system;

5. Adopt fixed water distribution system, choose ABS multi-layer flow low-pressure water spray nozzle, uniform water distribution, long service life, and low water distribution head, which is conducive to saving system water distribution power;

6. The BO-160/45 asymmetric water collector device is arranged on the water pipe, and the water collecting effect is exnt, so that the floating water loss of the cooling tower is reduced to 0.01% or less;

7. The tower frame can be made of Q-235 profile, 304 stainless steel profile and FRP profile. The "304/FRP" frame can be used in acidic environment with circulating water as low as 1.0;

8. The cooling tower frame with a water volume of 800m3/h can adopt reinforced concrete frame. Although the construction period is slightly longer and the one-time investment is higher, it has high service life and low maintenance cost. The user can choose according to the actual situation;

9. If the turbidity of circulating water is as high as 50ppm or more, or contains impurities such as oil, it is necessary to use PVC mesh packing or 304 stainless steel hanging plate to fill the water according to the water quality conditions. The turbidity of the circulating water can be extended to 450ppm.

10. The structure is stable, and the maintenance platform is installed at the top of the tower. It is more convenient to maintain and repair;

Premium Services
Need Suppliers
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok